Geebung Factory Extension

Value: $1.1M

The brief.

MDB won the project in a competitive tender against two other builders. The original design called for excavating the site to form the internal slab, which added significant cost to the extension.

Our approach.

MDB redesigned the internal slab as a suspended slab. This removed the excavation works and reduced the overall price, without compromising the finished building.

The result.

Construction began in May 2026 and was completed in September 2026. The client gained additional factory space at a lower cost, thanks to a practical approach to design and buildability.

“Matt led his team to complete Australia’s first 5-star, green star aged care facility in Carseldine on time and within budget, a real professional.”

Melissa Argent / CEO, Rockpool

Related Projects

Multi-Residential

Caloundra, QLD

2027

Canberra Terrace, Caloundra

CLIENT: BOB. Out of the Box

A coordinated design team taking a new residential building from concept through development approval, with construction due to start in early 2027.

DELIVERY ROLE

Builder/Developer

$12.5M

Commercial

Gympie, QLD

2026

Anglican Church Parish Centre

CLIENT: Anglican Church Gympie

Three rounds of value engineering brought an over-budget tender within reach. Delivered on time: parish office, commercial kitchen, conference room and accessible grounds.

DELIVERY ROLE

Head Contractor

$1.2M

Education

Kilkivan, QLD

2025

Kilkivan State School

CLIENT: QBuild

Two covered walkways, sports court additions and new accessible toilets, brought back within budget with QBuild and completed on time.

DELIVERY ROLE

Head Contractor

$1.1M

Not sure which part you need?

Call Matt on 0419 784 418 and talk it through.

Ten minutes on the phone is usually enough to know.